KeretaApi Indonesia (Persero) is a state-owned company specialising in managing and operating the railways networks throughout Indonesia. The network in West Java is managed by the Operational Region Office II or DAOP 2 Bandung. Under DAOP 2 Bandung, PT. KAI manages four types of railway systems:
- Local railway operates from Bandung city to Pangandaran district
- Pioneer railway operates from Bandung city to Cianjur and Sukabumi
- Long-distance railway operates from Bandung city to Jakarta on one side (North), and to East Java on the other side (South).
- Cargo railway operates from Bandung city to Jakarta on one side (North), and to East Java on the other side (South).
Travel matrices
Distance Travel Matrix (km) – Long-distance railway (Northern)
|
Bandung |
Padalarang |
Purwakarta |
Cikampek |
Bandung |
|
5 |
52 |
71 |
Padalarang |
5 |
|
44 |
75 |
Purwakarta |
52 |
44 |
|
19 |
Cikampek |
71 |
75 |
19 |
|
Travel Time Matrix (Hours) – Long-distance railway (Northern)
|
Bandung |
Padalarang |
Purwakarta |
Cikampek |
Bandung |
|
45 mins |
2 hours |
2.5 hours |
Padalarang |
45 mins |
|
1 hour 15 min |
1 hour 45 mins |
Purwakarta |
2 hours |
1 hour 15 mins |
|
30 mins |
Cikampek |
2.5 hours |
1 hour 45 mins |
30 mins |
|
Distance Travel Matrix (km) – Long-distance railway (Southern)
|
Bandung |
Kiaracondong |
Cicalengka |
Cibatu |
Tasikmalaya |
Banjar |
Bandung |
|
5 |
27 |
55 |
115 |
155 |
Kiaracondong |
5 |
|
22 |
53 |
110 |
150 |
Cicalengka |
27 |
22 |
|
31 |
88 |
128 |
Cibatu |
55 |
53 |
31 |
|
57 |
97 |
Tasikmalaya |
115 |
110 |
88 |
57 |
|
40 |
Banjar |
155 |
150 |
128 |
97 |
40 |
|
Travel Matrix (Hours) – Long-distance railway (Southern)
|
Bandung |
Kiaracondong |
Cicalengka |
Cibatu |
Tasikmalaya |
Banjar |
Bandung |
|
15 mins |
1 hour |
2 hours |
3 hours |
4 hours |
Kiaracondong |
15 mins |
|
45 mins |
1 hour 45 mins |
2 hours 45 mins |
3 hours 45 mins |
Cicalengka |
1 hour |
45 mins |
|
1 hour |
2 hours |
3 hours |
Cibatu |
2 hours |
1 hour 45 mins |
1 hour |
|
1 hour |
2 hours |
Tasikmalaya |
3 hours |
2 hours 45 mins |
2 hours |
1 hour |
|
1 hour |
Banjar |
4 hours |
3 hours 45 mins |
3 hours |
2 hours |
1 hour |
|
Railway Companies and Consortia
PT. Kereta Api Indonesia (Persero) is the railway authority in Indonesia. The operation in Bandung city and surrounding area is managed by the Operational Region Office II or DAOP 2 Bandung.
For more information on railway company contact details, please see the following link: 4.9 Indonesia Railway Company Contact List
Capacity Table
Rail Operator Capacity |
|
|
Operator / Company Name |
Lines Operates On |
PT. Kereta Api (Persero) DAOP 2 Bandung |
Max Train Length and / or Pulling Capacity |
11 carriages |
Locomotives |
Diesel |
Covered Freight Wagons Size (m) |
0 |
Flatbed Freight Wagons Size (m) |
0 |
High-sided Freight Wagons Size (m) |
0 |
Drop-side Freight Wagons Size (m) |
0 |
Key Route Information
Standard Route Information |
||
|
Bandung - Banjar |
Bandung - Cikampek |
Track Gauge |
1.067 mm (3ft 6 in) |
1.067 mm (3ft 6 in) |
Ruling Gradient |
N/A |
N/A |
Total Track Distance |
Single |
Single |
Type of Rail |
UIC 54 / R54 |
UIC 54 / R54 |
Type of Sleeper and Fastenings |
Steel and Clip |
Steel and Clip |
Total Track Travel Time |
4 hours |
2.5 hours |
Maintenance |
Marginal |
Marginal |
Companies / Consortiums Operating on Line |
N/A |
N/A |
Traffic Frequency |
Daily |
Daily |
Security |
Good |
Good |
Main Stations |
Bandung |
Bandung |