Overview
There are many milling companies operating in Tajikistan but most of them are quite small. The two biggest mills are in Dushanbe and Khatlon respectively. All the milling companies are private. Almost 85% of wheat flour is imported from Kazakhstan and Russia.
For more information on milling company contact details, please see the following link: 4.6 Tajikistan Storage and Milling Company Contact List
LLC 'Zernavaya Kompnaiya'
Milling Company LLC “Zernavaya Kompnaiya” has a capacity of 300 mt/day. Located in St. Khobilov 64, Gafurov. 735690, Tajikstan. It has railways inside. The factory is working with two milling machines, one from Turkey and another from Italy. The capacity of the Turkish mill is 120mt/day and of the italian 300 mt/day. Total capacity of the companyy is approximately 5,000 mt/month.
Company Name & Address |
Contact Names & Email |
Telephone & Fax |
LLC “Zernavaya Kompnaiya”
|
Name: Sergey Rakhimov Title: Geniral Director Email: sergey.rakhimov@buona.tj Web site: www.buona.tj |
Tel: +992 44 600 85 02 Fax: +992 3442 34103 Cel: +992 92 771 3131 |
Facilities |
|
Parking area inside compound |
800 m² |
Drainage |
Good |
Fire Fighting Equipment |
Yes |
Number of Ventilators |
97.7 % aspirating |
Electricity Load (KVA) |
450 KVA x 2 |
Backup Generator |
No |
Milling Equipment |
|||
Origin of Machinery |
Year of Mfg |
Year of Installation |
Condition |
Turkish Machinery |
2009 |
2009 |
Operational |
Italian Machinery |
2016 |
2017 |
Operational |
Maintenance |
|||
Duration (hours / week) |
4 |
Type of maintenance |
Regular |
Other Equipment or Machinery Installed |
||||
Type of Equipment |
Yes/No |
Number |
Owned |
Comments |
Fortification Feeder |
Yes |
3 |
Yes |
Autoproportioner (дозатор) |
Bag Cleaning Plant |
No |
|
|
|
Moisture Tester |
Yes |
4 |
Yes |
|
Staffing |
|
Number of full time skilled workers |
276 |
Number of full time labourers |
10 (Full Automatic System) |
Weighbridge |
||||
Number |
2 |
Capacity (mt) |
Length (m) |
Type |
Within Compound |
10 |
12 |
Manually operated |
|
Within Compound |
13 |
|
Electronic weigher for difrent purposes (availbe Avro-scales and rail scales) |
Building |
|||
|
Length (m) |
Width (m) |
Height (m) |
Building – Wheat Mill |
25 |
13 |
|
Building – Maize Mill |
25 |
13 |
|
Walls |
Stone (concrete structure) |
||
Roof |
Zinc plated sheets |
||
Floor |
Concrete |
Conditions & Cleanliness |
||
|
Outside |
Inside |
Cracks in walls or roof |
No |
No |
Signs of rodent activity |
No |
No |
Signs of birds entry |
No |
No |
Damaged gutters/drains |
No |
No |
Signs of moisture |
No |
No |
Adjacent Vegetation |
None |
Uncut |
Cleanliness |
Good |
Poor |
Pest Control |
|
Fumigation |
Done – Every contract |
Spraying |
Done – Every contract |
Rodenticides |
Done – Every contract |
Rodent Trapping |
Done – Every contract |
Security |
|
Security |
Good |
Compound |
Fenced |
Access |
|||||
Distance from main town |
17 |
km |
|||
Travel time if not located in town |
25 min |
hrs |
|||
Road condition to Mill |
Good |
|
|||
Road limitation (if any) |
Width (m) |
8 |
Max. Tonnage |
No limitation |
|
Rail connections |
Yes |
||||
On the railway from |
1.5km |
to |
Mill |
Milling Capacity (Mt) |
||
Commodities |
Daily Capacity (mt) |
Monthly Activity (mt) |
Wheat |
420 |
5,400 |
Storage Capacity |
||
Storage in Metric Tonnes |
Wheat – Covered (mt) |
Flour – Covered (mt) |
Within the Compound |
64,000 |
1,500 |
Capacity to Blend |
N/A |
Loading & Discharge Rates |
N/A |
Transport Capacity at Mill |
10 trucks per day |
Open Joint Stock Company Somon – Khatlon
Milling Company OJSC Somon-Khatlon has a capacity of 120mt/day. Located in Kolkhozobod district, the mill has railways inside and a locomotive. The factory is working with Soviet machinery installed in 1985. Total production is approximately 3,600mt/month.
Company Name & Address |
Contact Names & Email |
Telephone & Fax |
OJSC Somon – Khatlon |
Name: Rakhimov N.Z. Title: Director |
Tel: +992 93 502 7211 |
Facilities |
|
Parking area inside compound |
3,200 m² |
Drainage |
Good |
Fire Fighting Equipment |
Yes |
Number of Ventilators |
2 aspirating |
Electricity Load (KVA) |
667 KVA |
Backup Generator |
No |
Milling Equipment |
|||
Origin of Machinery |
Year of Mfg |
Year of Installation |
Condition |
12 A-153H2 |
1985 |
1985 |
Operational |
9 Noriya NC |
1985 |
1985 |
Operational |
6-3RSH-6 |
1985 |
1985 |
Operational |
30 SHU-6 |
1985 |
1985 |
Operational |
Maintenance |
|||
Duration (hours / week) |
4 |
Type of maintenance |
Regular |
Other Equipment or Machinery Installed |
||||
Type of Equipment |
Yes/No |
Number |
Owned |
Comments |
Fortification Feeder |
Yes |
1 |
Yes |
|
Bag Cleaning Plant |
No |
|
|
|
Moisture Tester |
Yes |
2 |
Yes |
|
Staffing |
|
Number of full time skilled workers |
58 |
Number of full time labourers |
120 |
Weighbridge |
||||
Number |
2 |
Capacity (mt) |
Length (m) |
Type |
Within Compound |
25 |
13 |
Manually operated |
|
Within Compound |
25 |
13 |
Manually operated |
Building |
|||
|
Length (m) |
Width (m) |
Height (m) |
Building – Wheat Mill |
90 |
18 |
28.8 |
Walls |
Stone (concrete structure) |
||
Roof |
Zinc plated sheets |
||
Floor |
Concrete |
Conditions & Cleanliness |
||
|
Outside |
Inside |
Cracks in walls or roof |
No |
No |
Signs of rodent activity |
No |
No |
Signs of birds entry |
No |
No |
Damaged gutters/drains |
No |
No |
Signs of moisture |
No |
No |
Adjacent Vegetation |
None |
None |
Cleanliness |
Good |
Good |
Pest Control |
|
Fumigation |
Done – Every contract |
Spraying |
Done – Every contract |
Rodenticides |
Done – Every contract |
Rodent Trapping |
Done – Every contract |
Security |
|
Security |
Good |
Compound |
Fenced |
Access |
|||||
Distance from main town |
5 |
km |
|||
Travel time if not located in town |
15min |
hrs |
|||
Road condition to Mill |
Good |
|
|||
Road limitation (if any) |
Width (m) |
8 |
Max. Tonnage |
70 |
|
Rail connections |
Yes |
||||
On the railway from |
1.3km |
to |
Mill |
Milling Capacity (Mt) |
||
Commodities |
Daily Capacity (mt) |
Monthly Activity (mt) |
Wheat |
120 |
3,600 |
Storage Capacity |
||
Storage in Metric Tonnes |
Wheat – Covered (mt) |
Flour – Covered (mt) |
Within the Compound |
138,000 |
3,500 |
Capacity to Blend |
N/A |
Loading & Discharge Rates |
N/A |
Transport Capacity at Mill |
6 trucks per day |
Justcombe – Invest
Milling Company Justcombe – Invest has a capacity of 70mt/day. There is railway access. A Turkish-manufactured mill was installed in 2002. Total production is approximately 1,500 mt per month. The company has experience working with international organizations.
Company Name & Address |
Contact Names & Email |
Telephone & Fax |
Justcombe – Invest Dushanbe |
Name: Kulov Mahmadyor Title: Deputy Director Email: justcombeinvest@rambler.ru |
Tel: +992 37 225 0128 Fax: +992 37 236 3193 |
Facilities |
|
Parking area inside compound |
500 m² |
Drainage |
Good |
Fire Fighting Equipment |
Yes |
Number of Ventilators |
1 |
Electricity Load (KVA) |
250 KVA |
Backup Generator |
No |
Milling Equipment |
|||
Origin of Machinery |
Year of Mfg |
Year of Installation |
Condition |
Turkish Machinery |
2002 |
2002 |
Operational |
Maintenance |
|||
Duration (hours / week) |
4 |
Type of maintenance |
regular |
Other Equipment or Machinery Installed |
||||
Type of Equipment |
Yes/No |
Number |
Owned |
Comments |
Fortification Feeder |
Yes |
1 |
Yes |
|
Bag Cleaning Plant |
No |
|
|
|
Moisture Tester |
Yes |
1 |
Yes |
|
Staffing |
|
Number of full time skilled workers |
25 |
Number of full time labourers |
25 |
Weighbridge |
||||
Number |
1 |
Capacity (mt) |
Length (m) |
Type |
Within Compound |
25 |
12 |
Manually operated |
Building |
|||
|
Length (m) |
Width (m) |
Height (m) |
Building – Wheat Mill |
30 |
12 |
9.5 |
Walls |
Stone (concrete structure) |
||
Roof |
Zinc plated sheets |
||
Floor |
Concrete |
Conditions & Cleanliness |
||
|
Outside |
Inside |
Cracks in walls or roof |
No |
No |
Signs of rodent activity |
No |
No |
Signs of birds entry |
No |
No |
Damaged gutters/drains |
No |
No |
Signs of moisture |
No |
No |
Adjacent Vegetation |
None |
None |
Cleanliness |
Good |
Good |
Pest Control |
|
Fumigation |
Done – Every contract |
Spraying |
Done – Every contract |
Rodenticides |
Done – Every contract |
Rodent Trapping |
Done – Every contract |
Security |
|
Security |
Good |
Compound |
Fenced |
Access |
|||||
Distance from main town |
5 |
km |
|||
Travel time if not located in town |
15min |
hrs |
|||
Road condition to Mill |
Good |
|
|||
Road limitation (if any) |
Width (m) |
8 |
Max. Tonnage |
No limitation |
|
Rail connections |
Yes |
||||
On the railway from |
3km |
to |
Mill |
Milling Capacity |
||
Commodities |
Daily Capacity (mt) |
Monthly Activity (mt) |
Wheat |
70 |
1,500 |
Storage Capacity |
||
Storage in Metric Tonnes |
Wheat – Covered (mt) |
Flour – Covered (mt) |
Within the Compound |
10,000 |
500 |
Capacity to Blend |
N/A |
Loading & Discharge Rates |
US$ 2.30/mt |
Transport Capacity at Mill |
4 trucks per day |